QLQ zinc alloy surface finishing equipment and process QLQ zinc alloy surface finishing equipment and process

Professional Zinc Alloy Surface Finishing Solutions

Plating Workshop — trades and people

Plating Workshop — trades and people

This workshop covers 5 trades. Open any trade to see the level guide, or jump straight to the level you hire or train for. Each trade page carries the equipment scene, the parameters and the mistakes that matter at that level.

Search by trade + level (barrel senior), by defect (blistering), or by parameter (brightener dosing). Full-text and title search across the whole site.

Plating workshop at a glance
Plating workshop at a glance - Barrel, rack, gold, anodising and bath control under one roof.

Trades in this workshop

How the four levels are judged

How the four levels are judged
How the four levels are judged - Years on the tools, plus what the person can actually run alone.
  • Junior (1-3 yrs) — Runs the SOP, reads the parameter sheet, spots common defects
  • Intermediate (3-5 yrs) — Knows why a parameter moves, reads data, diagnoses root causes
  • Senior (5-8 yrs) — Owns the process window and the link to upstream/downstream steps
  • Management (8+ yrs) — Cost, yield, rescue plans, team and customer communication

Not sure where a topic sits? Use the trade + level picker, or open the full knowledge map. Owners can start from the process overview.

Line layout: what has to be next to what

ZoneContainsWhy the position matters
Load / unloadRacking station, jigs, inspection lightKeeps handling marks away from the finished area
PretreatmentDegrease, pickle, rinse cascadeShort transfer distance to plating
PlatingTanks, rectifiers, filters, agitationRectifier close to the tank reduces voltage drop
Post-treatmentPassivate, seal, dryDrying right after sealing avoids water marks
WastewaterCollection, dosing, sludgeGravity flow where possible

Throughput and thickness are a trade

  • Doubling current halves time but narrows the thickness window
  • Rack density changes current distribution more than bath chemistry
  • Measure thickness at three positions per rack, every shift

FAQ

How many tanks do we need to start?

A single-line shop usually runs pretreatment, copper, nickel, decorative and two rinses between stages. Adding a spare rinse tank is cheaper than rework.

Can one line run decorative and functional work?

Not at the same time without contamination risk. Share the pretreatment, separate the plating tanks.

Related pages

FAQ

What about plating workshop — trades and people?
This workshop covers 5 trades. Open any trade to see the level guide, or jump straight to the level you hire or train for.
What about trades in this workshop?
Barrel Plating Core trade of this workshop Level guide → Barrel + plating tank Junior 3+ years (qualified technician) articles: 6 Intermediate 5+ years, solves 1-3 problem areas alone articles: 25 Senior 8+ years, covers most problems and trains others articles: 10 Management 5+ years, full trade coverage and team
How the four levels are judged?
How the four levels are judged - Years on the tools, plus what the person can actually run alone. Junior (1-3 yrs) — Runs the SOP, reads the parameter sheet, spots common defects Intermediate (3-5 yrs) — Knows why a parameter moves, reads data, diagnoses root causes Senior (5-8 yrs) — Owns the process window and the li
What about line layout: what has to be next to what?
Zone Contains Why the position matters Load / unload Racking station, jigs, inspection light Keeps handling marks away from the finished area Pretreatment Degrease, pickle, rinse cascade Short transfer distance to plating Plating Tanks, rectifiers, filters, agitation Rectifier close to the tank reduces voltage drop Pos