collection-banner-image collection-banner-image

Professional Zinc Alloy Surface Finishing Solutions

Gold Plating

Gold Plating

Gold Plating

Get a Free Quote Today

Send us your samples or drawings — our engineers reply within 24 hours with pricing and technical advice.

Contact Us
Workshop Planning Data

Gold Plating — Data Zinc Alloy Finishing Managers Need

Gold plating (rack and selective) and gold electroforming produce premium jewelry-grade finishes on zinc alloy, brass and silver — with tight karat control and high-value output per square meter.

350 m²Workshop Area
14 peopleTeam Size
120 kWInstalled Power
100-300k pcs/dayDaily Output (10 h)

Quality Inspection & Control

Check itemMethodAcceptance standard
Gold thicknessX-ray fluorescence0.05-5.0 μm per karat spec
Karat / purityXRF analysis24K ≥ 99.9%, 18K ≥ 75% Au
Color matchColorimeter ΔEΔE ≤ 1.0 vs karat master
AdhesionBend + thermal shockNo flake at 150 °C × 30 min
Wear resistanceTaber / rub testNo wear-through at spec cycles
Contact resistanceMilliohm meter≤ 10 mΩ for industrial contacts

Workshop Layout & Floor Area

ZoneArea
Clean-room plating line110 m²
Electroforming shop80 m²
Precious metal store (vault)20 m²
QA lab + XRF40 m²
Rinse / DI / recovery50 m²
Waste & gold recovery25 m²
Utility & lockers25 m²
Total workshop350 m²

Manpower & Shift Plan

RoleHeadcount
Platers / operators7
Gold solution technicians2
QC inspectors (XRF)2
Precious metal control1
Supervisor1
Maintenance1
Total (2 shifts × 10 h)14

Power & Utility Demand

EquipmentDemand
Rectifiers (precious metal)35 kW
Heaters / chillers30 kW
Pumps / filters15 kW
Clean-room HVAC18 kW
Electroforming power10 kW
Lighting & auxiliary12 kW
Installed total120 kW
Typical running load≈ 95 kW

Production Flow Chart

PretreatmentPolish, clean, activate
Strike LayerNickel or silver strike
Gold PlateRack / barrel / selective gold
Rinse & RecoveryDI rinse + gold drag-out recovery
Dry & QCXRF thickness + color check
Protect & PackSeal, wrap, pack

Daily Capacity — 10-Hour Operating Day

ParameterValue
Cycle time30-60 min
Load per batch30-80 kg
Batches per 10 h day10-16
Daily output100,000-300,000 pcs
Monthly output (26 days)2.6-7.8 million pcs

Output Value Estimate

ParameterValue
Plating fee per pieceUSD 0.02-0.12
Daily output value (10 h)USD 8,000-25,000
Monthly output valueUSD 210,000-650,000
Annual output valueUSD 2,500,000-7,800,000

Related Products — Complete Gold Plating Solution

Machines, chemicals and consumables selected from the real QLQ product range for this process. Every product page is live and ready to quote.