collection-banner-image collection-banner-image

Professional Zinc Alloy Surface Finishing Solutions

Pretreatment for rack plating

Pretreatment for rack plating

Pretreatment for rack plating - image 1

Rack plating pretreatment is the most critical step in the rack plating process (it usually accounts for more than 60% of the total process time, and 60%-80% of plating quality defects arise from improper pretreatment). Its core function is to create a clean, activated and uniform surface condition for subsequent plating, so as to ensure the quality and performance of the plating layer.

1. Process Flow Chart

Pretreatment for rack plating - image 2

2. Process Video

3. Process Details

1. Hand Polishing Or Barrel Polishing

1. Hand Polishing Or Barrel Polishing

Hand polishing is suitable for high-end products, while barrel polishing is recommended for ordinary products. Polish unevenness, burrs, grinding marks, water stains and other defects on the product surface to make the electroplated products more full and bright, achieving a mirror - like finish.

2. MC for removing wax

2. MC for removing wax

Remove wax from hand-polished products and dry them thoroughly.

3. Hanging or hanging machine

3. Hanging or hanging machine

Hang the hardware parts on special fixtures and avoid collision and scratch of the workpieces.

4-1. Sulfuric Acid Tank

4-1. Sulfuric Acid Tank

Wax Removal / Oil Removal. If the wax is not completely removed, the residual wax or oil will result in poor product quality.

4-1-1. Recycling Tank

4-1-1. Recycling Tank

Pre-rinsing in recovery tank (30-60 seconds to dissolve concentrated sulfuric acid adhering to the surface) Drain residual liquid

4-2. Ultrasonic Wax Removal (Alternative to the sulfuric acid tank)

4-2. Ultrasonic Wax Removal (Alternative to the sulfuric acid tank)

Remove wax and oil on the workpiece surface and inside complex structures

5. Three times Cleaning Tank

5. Three times Cleaning Tank

Remove residual liquid on the workpiece surface.

6. Six sets Ultrasonic Tank

6. Six sets Ultrasonic Tank

Get rid of moisture and electroplating solution better.

7. Two times Cleaning Tank

7. Two times Cleaning Tank

Remove residual liquid on the workpiece surface.

8. Electrolyticprotection Tank

8. Electrolyticprotection Tank

Degrease again to break down impurities, and remove and clean out residues from the holes, gaps or joints of the products.

9. Three times Cleaning Tank

9. Three times Cleaning Tank

Remove residual liquid on the workpiece surface.

10. Two sets Deciduate Tank

10. Two sets Deciduate Tank

Remove the matte film on the zinc alloy to make the zinc alloy turn white.

11. Three times Cleaning Tank

11. Three times Cleaning Tank

Remove residual liquid on the workpiece surface.

12. Activation Tank

12. Activation Tank

Activation with 15% dilute sulfuric acid (Ratio: 85L water + 15L sulfuric acid = 100L total volume).

13. 2 times Cleaning Tank

13. 2 times Cleaning Tank

Remove residual liquid on the workpiece surface.

14. Unhanging

14. Unhanging

Get a Free Quote Today

Send us your samples or drawings — our engineers reply within 24 hours with pricing and technical advice.

Contact Us
Workshop Planning Data

Pretreatment for rack plating — Data Zinc Alloy Finishing Managers Need

The complete pre-treatment department combines polishing, dewaxing, degreasing, acid activation and phosphating so every zinc alloy part enters plating or painting with a chemically clean, activated surface.

450 m²Workshop Area
16 peopleTeam Size
150 kWInstalled Power
1-2M pcs/dayDaily Output (10 h)

Quality Inspection & Control

Check itemMethodAcceptance standard
Water-break testSpray + visualContinuous film ≥ 30 s on 100% sampled racks
Surface roughnessRa testerRa ≤ 0.8 μm before plating; ≤ 0.4 μm bright
Activation qualityCopper flash testUniform flash, no skip plating
Phosphate coating weightWeigh-difference1.5-3.0 g/m² when phosphating applied
Cross-contaminationBath titration logsAll baths within recipe control limits
Batch traceabilityWork order scan100% batch barcode traceable to QC records

Workshop Layout & Floor Area

ZoneArea
Polishing section120 m²
Dewaxing & degreasing line100 m²
Activation & phosphating line100 m²
Rinse / DI / water treatment60 m²
QA lab & chemical store40 m²
Utility & lockers30 m²
Total department450 m²

Manpower & Shift Plan

RoleHeadcount
Operators (all lines)10
Chemical technicians2
QC inspectors2
Supervisor1
Maintenance1
Total (2 shifts × 10 h)16

Power & Utility Demand

EquipmentDemand
Polishing equipment45 kW
Dewax / degrease heating38 kW
Phosphating heating + pumps28 kW
Ultrasonic + rinse pumps14 kW
Air compressor + exhaust19 kW
Lighting & auxiliary6 kW
Installed total150 kW
Typical running load≈ 118 kW

Production Flow Chart

PolishBarrel / hand / mass finishing
Dewax & DegreaseSolvent or hot alkaline
RinseMulti-stage counter-flow
ActivateAcid or pickle activation
Phosphatize (optional)Zinc phosphate for paint base
Final Rinse & DryDI rinse + hot-air dry, QC gate

Daily Capacity — 10-Hour Operating Day

ParameterValue
Line cycle40-70 min
Simultaneous batches6-8 in process
Batches per 10 h day16-22
Daily output1,000,000-2,000,000 pcs
Monthly output (26 days)26-52 million pcs

Output Value Estimate

ParameterValue
Processing fee per pieceUSD 0.003-0.008
Daily output value (10 h)USD 3,000-7,000
Monthly output valueUSD 78,000-180,000
Annual output valueUSD 940,000-2,160,000

Related Products — Complete Pretreatment for rack plating Solution

Machines, chemicals and consumables selected from the real QLQ product range for this process. Every product page is live and ready to quote.