Workshop Planning Data

Pretreatment — Data Zinc Alloy Finishing Managers Need

The complete pre-treatment department combines polishing, dewaxing, degreasing, acid activation and phosphating so every zinc alloy part enters plating or painting with a chemically clean, activated surface.

450 m²Workshop Area
16 peopleTeam Size
150 kWInstalled Power
1-2M pcs/dayDaily Output (10 h)

Quality Inspection & Control

Check itemMethodAcceptance standard
Water-break testSpray + visualContinuous film ≥ 30 s on 100% sampled racks
Surface roughnessRa testerRa ≤ 0.8 μm before plating; ≤ 0.4 μm bright
Activation qualityCopper flash testUniform flash, no skip plating
Phosphate coating weightWeigh-difference1.5-3.0 g/m² when phosphating applied
Cross-contaminationBath titration logsAll baths within recipe control limits
Batch traceabilityWork order scan100% batch barcode traceable to QC records

Workshop Layout & Floor Area

ZoneArea
Polishing section120 m²
Dewaxing & degreasing line100 m²
Activation & phosphating line100 m²
Rinse / DI / water treatment60 m²
QA lab & chemical store40 m²
Utility & lockers30 m²
Total department450 m²

Manpower & Shift Plan

RoleHeadcount
Operators (all lines)10
Chemical technicians2
QC inspectors2
Supervisor1
Maintenance1
Total (2 shifts × 10 h)16

Power & Utility Demand

EquipmentDemand
Polishing equipment45 kW
Dewax / degrease heating38 kW
Phosphating heating + pumps28 kW
Ultrasonic + rinse pumps14 kW
Air compressor + exhaust19 kW
Lighting & auxiliary6 kW
Installed total150 kW
Typical running load≈ 118 kW

Production Flow Chart

PolishBarrel / hand / mass finishing
Dewax & DegreaseSolvent or hot alkaline
RinseMulti-stage counter-flow
ActivateAcid or pickle activation
Phosphatize (optional)Zinc phosphate for paint base
Final Rinse & DryDI rinse + hot-air dry, QC gate

Daily Capacity — 10-Hour Operating Day

ParameterValue
Line cycle40-70 min
Simultaneous batches6-8 in process
Batches per 10 h day16-22
Daily output1,000,000-2,000,000 pcs
Monthly output (26 days)26-52 million pcs

Output Value Estimate

ParameterValue
Processing fee per pieceUSD 0.003-0.008
Daily output value (10 h)USD 3,000-7,000
Monthly output valueUSD 78,000-180,000