QLQ zinc alloy surface finishing equipment and process QLQ zinc alloy surface finishing equipment and process

Professional Zinc Alloy Surface Finishing Solutions

Gold & Precious Plating — Technician Levels

Gold & Precious Plating — Technician Levels

Pick your level to see exactly which pages you should read. Each level below carries its own article library, with live article counts and the newest titles.

Search by trade + level (barrel senior), by defect (blistering), or by parameter (brightener dosing). Full-text and title search across the whole site.

Gold & Precious Plating: which level are you?Four levels - the work you do on this equipment, and the pages you should read.Barrel + gold plating tankJunior3+ years (qualified technician)Barrel + gold plating tankIntermediate5+ years, solves 1-3 problem areas aloneBarrel + gold plating tankSenior8+ years, covers most problems and trains othersBarrel + gold plating tankManagement5+ years, full trade coverage and team leadership

What each level covers

Article counts and the newest titles are read live from each section - they update automatically when new articles are published.

Barrel + gold plating tank
Junior · 3+ years (qualified technician) 2 articles
Start here if you are 1-3 years in: the standard steps, the daily checks and the values you must not skip.
Inside: 5-step flow walk-through · daily check list · basic parameter values · simple do / do-not rules
Loading the latest articles…
Barrel + gold plating tank
Intermediate · 5+ years, solves 1-3 problem areas alone 3 articles
For 3-5 years: diagnose defects, read real data (titration, hull cell, salt spray, film gauge) and set the working windows.
Inside: defect cause & cure · parameter windows · data reading · option comparisons
Loading the latest articles…
Barrel + gold plating tank
Senior · 8+ years, covers most problems and trains others 2 articles
For 5-8 years: how the steps before and after this one change your result - root cause, cross-process reasoning, deep analysis.
Inside: root-cause tracing · interaction with pre-treatment / post-finish · failure analysis · boundary conditions
Loading the latest articles…
Barrel + gold plating tank
Management · 5+ years, full trade coverage and team leadership 2 articles
For the supervisor / owner: cost per piece, capacity, staffing, emergency recovery and keeping customers happy.
Inside: cost & payback models · capacity and staffing · KPI and governance · claims & recovery plans
Loading the latest articles…

Gold & Precious Plating on the shop floor

Barrel Plating Line (Cu + Ni + Au-flash)INTERMEDIATEGold & Precious Plating - process boardOperatorParts must be LIVE before they touch the bath - no deadentry, ever.ChemistCu strike at 0.5-1.5 A/dm2: a thin strike stops zincreaching the nickel.QCSalt spray 24 h plus colour match against the goldstandard panel.ManagerGold flash is the expensive layer - track cost per 1000pcs.STEP 1Load & DegreaseLoad 60-70%Cathodic 2 minCheck danglers1STEP 2Alkaline Cu StrikeCu 8-12 g/L0.5-1.5 A/dm23-6 min2STEP 3Bright NickelNi 60-80 g/L0.5-2 A/dm210-20 min3STEP 4Imitation-Gold FlashAu flash 0.5-1 g/L0.3-0.8 A/dm230-90 s4STEP 5Rinse & DryCascade x360-70 CWeight check5!A dead entry dissolves zinc into the bath and kills adhesion - current on first.COMMON MISTAKES vs WHAT WORKSfrom shop-floor auditsxEnter the bath dead (no current)vLive entry: current on before immersionxSkip the copper strikevCu strike stops zinc contaminating the nickelxJudge gold colour under warm lightvCompare with the standard panel under D65 light3-6 minCu strike10-20 minNi layer30-90 sAu flashCASE FROM THE LINECase: blistered gold traced to a dead entry that dissolved zinc into the nickel.QLQ Surface Treatment | steps, roles, checkpoints, mistakes and a real case

Related: Process Overview · All trades · Process Selection

Gold plating station: standards that matter

ItemStandardWhy
Bath temperaturePer TDS, usually 55-65 CColour shifts a full shade when cold
Gold concentrationTitrated per shiftDirectly controls colour and thickness
Current densityWithin the supplier windowToo high burns edges, too low gives a dull film
Rack contactClean, spring loadedGold shows contact resistance immediately
Thickness checkXRF on flat and edgeEdges run thicker - report min, not average

FAQ

Why does the same bath give two colours in one day?

Temperature drop and gold concentration drift. Log both every shift before blaming the additive.

How do we keep gold cost under control?

Track grams consumed per 1,000 parts, not the bath price. Drag-out recovery pays back fastest.

Can gold be plated over copper without nickel?

It plates, but diffusion kills the colour within weeks. The nickel barrier is what keeps the tone.