Professional Zinc Alloy Surface Finishing Solutions
Plating color
Rack plating color

1-Decoration & Value-adding Diverse colors match bag designs, enhance product grade, and meet customization needs. 2-Corrosion Protection Plating layers isolate substrates from air and moisture, prevent rust, and extend service life. 3-Performance Enhancement Hard chrome plating boosts wear resistance; tin plating improves conductivity for special hardware. 4-Identification & Management Colors distinguish sizes/models, facilitating production sorting and warehouse management.
1. Process Flow Chart
2. Process Video
3. Process Details

1. Alkaline Copper Tank
The alkaline copper plating tank is a core process unit that performs copper plating on workpieces using an alkaline electroplating solution, and it is primarily applied for undercoat preparation prior to subsequent plating procedures.

2. Alkaline Copper Automatic Waterline
1. Hanging 2. 4 times Cleaning Tank 3. Neutralization Tank 4. 2 times Cleaning Tank 5. Unhanging

3. Acid Copper Tank
The acid copper plating tank is a process unit that conducts copper plating on workpieces with acidic electroplating solution. Usually following the alkaline copper undercoating process, its core functions are to improve coating flatness and increase the thickness of the copper coating.

4. Acid Copper Automatic Waterline
1. Hanging 2. 3 times Cleaning Tank 3. Neutralization Tank 4. 3 times Cleaning Tank 5. Unhanging

5. Shiny Nickel Tank
1、Nickel-containing Plating Low cost with higher luster than nickel-free plating, but not eco-friendly. 2、Nickel-free Plating High cost with slightly lower luster, yet eco-friendly and safe. It is ideal for high-end products and jewelry items (e.g., necklaces, ear studs). 3、Applying nickel-containing or nickel-free plating as a base before subsequent color plating can enhance the final coating’s luster and adhesion. For this reason, high-end clients generally opt for nickel/nickel-free plating prior to further color finishing.

6. Three times Cleaning Tank
Remove residual liquid on the workpiece surface.

7. Color Tank
At this stage, choose the plating tank matching your target color. such as: Rose Gold Tank Light Gold Tank Gun Color Tank Pearl nickel Tank

8. Recycling Tank
1、Recycle Valuable Metals & Cut Costs 2、Reduce Waste Discharge & Meet Environmental Standards 3、Clean Workpieces & Ensure Coating Quality 4、Prolong Bath Life & Save Consumables

9. Three times Cleaning Tank
Remove residual liquid on the workpiece surface.
Get a Free Quote Today
Send us your samples or drawings — our engineers reply within 24 hours with pricing and technical advice.
Contact Us
Workshop Planning Data
Plating color — Data Zinc Alloy Finishing Managers Need
The rack plating line handles larger zinc alloy parts, sliders on frames and parts requiring precise current distribution — high-end finishes with zero contact marks and excellent throwing power.
800 m²Workshop Area
26 peopleTeam Size
330 kWInstalled Power
300-600k pcs/dayDaily Output (10 h)
Quality Inspection & Control
| Check item | Method | Acceptance standard |
|---|---|---|
| Coating thickness | X-ray / coulometric | Cu 5-12 μm, Ni 5-15 μm per spec |
| Adhesion | Bend + thermal shock | No blister at 150 °C × 30 min |
| Color & gloss | Colorimeter / gloss meter | ΔE ≤ 1.0, gloss per customer card |
| Contact marks | Visual 10× | Zero rack contact marks on A-surface |
| Salt spray | NSS chamber | 12-96 h per spec |
| Throwing power | Cross-section micro | Minimum:maximum thickness ≥ 1:1.6 |
Workshop Layout & Floor Area
| Zone | Area |
|---|---|
| Rack line (16-20 tanks) | 320 m² |
| Rack loading / unloading | 90 m² |
| Rectifier & control room | 50 m² |
| QA lab + microscope | 60 m² |
| Rack maintenance | 60 m² |
| Chemical store | 60 m² |
| Waste treatment | 120 m² |
| Utility & lockers | 40 m² |
| Total workshop | 800 m² |
Manpower & Shift Plan
| Role | Headcount |
|---|---|
| Rack loaders / operators | 12 |
| Chemical technicians | 3 |
| QC inspectors | 3 |
| Rack maintenance | 2 |
| Wastewater operator | 1 |
| Supervisor | 1 |
| Maintenance / electrician | 2 |
| Logistics | 2 |
| Total (2 shifts × 10 h) | 26 |
Power & Utility Demand
| Equipment | Demand |
|---|---|
| Rectifiers 0-15 V × 1000-3000 A | 120 kW |
| Tank heating / cooling | 70 kW |
| Hoist / transporter system | 30 kW |
| Pumps / filters / dosing | 38 kW |
| Exhaust + scrubber | 25 kW |
| Dryer / oven | 22 kW |
| Wastewater treatment | 20 kW |
| Lighting & auxiliary | 5 kW |
| Installed total | 330 kW |
| Typical running load | ≈ 260 kW |
Production Flow Chart
PretreatmentHand / barrel polish, degrease
Rack LoadingLoad parts on plated copper racks
Copper Strike & BuildAlkaline Cu → acid Cu
Nickel / Color PlatingBright Ni, gold, gun, black etc.
Rinse ChainRecovery → DI rinse
Dry / Unload / QCOven dry, unload, inspect, pack
Daily Capacity — 10-Hour Operating Day
| Parameter | Value |
|---|---|
| Cycle per flight bar | 35-60 min |
| Parts per flight bar | 3,000-8,000 |
| Flight bars per 10 h day | 14-18 |
| Daily output | 300,000-600,000 pcs |
| Monthly output (26 days) | 8-15 million pcs |
Output Value Estimate
| Parameter | Value |
|---|---|
| Plating fee per piece | USD 0.015-0.04 |
| Daily output value (10 h) | USD 8,000-18,000 |
| Monthly output value | USD 210,000-470,000 |
| Annual output value | USD 2,500,000-5,600,000 |
Related Products — Complete Plating color Solution
Machines, chemicals and consumables selected from the real QLQ product range for this process. Every product page is live and ready to quote.
Rack nickel-plating-machine for zipper slider electro-plating-machine for zipper head gold plating machine electroplating
Machine & Equipment
Brightener Shiny Agent
Chemical & Coating
Coloring Powder
Chemical & Coating
QLQ-033 Blackening Liquid
Chemical & Coating
QLQ-032 Deep Position Agent
Chemical & Coating
QLQ-031 Complexing Agent
Chemical & Coating
Barrel Plating Machine Nickel Zinc Plating Machine Gold Plated Electroplating Chemical Metal Electroplating Machinery
Machine & Equipment