Rack Painting - Junior

Hanger Painting Masking Basics | Rack (Hanger) Painting Junior Guide

Scope of this guide

This junior-level guide sticks to the basics you must run without help: safe settings, daily checks and the pass criteria you can verify yourself.

Process: Rack (Hanger) Painting. Figures in this guide are industry-standard starting ranges; confirm against your supplier TDS before locking settings.

Working ranges and control points

The table below is the daily reference for a spray line. Set by the card, verify by the control point column.

ParameterTypical rangeControl pointWatch out
Viscosity (Ford cup 4)16–22 sAdjust with thinner by tempToo thin sags on vertical faces
Gun distance150–200 mmOverlap 50% passesClose gun blows wet film
Flash-off5–10 min ambientTack-free before bakeTrapped solvent bubbles
Wet film per pass20–35 µmTwo passes typicalOne heavy pass sags
BakeObject 60–80 °C × 30 minData logger per batchOver-bake embrittles

Standard routine

  1. Strain paint before loading the cup
  2. Mask contact points and assembly faces
  3. Spray top faces first, verticals last
  4. Hold tack test before parts enter bake
  5. Log viscosity and thinner ratio per batch
Rack (Hanger) Painting junior - Live line operation - QLQ workshop photo
Live line operation — QLQ workshop photo

Engineer notes

  • Sag on verticals is viscosity and pass weight, not gun distance alone
  • Masking paper must be heat grade or it sticks in bake
  • Colour drift between batches: strain and mix full kits only
  • Hanger tips touch wet film — rotate hanger bars by shift
  • Flash-off time doubles in humid season
Safety: Solvent vapours are flammable and a health hazard. Ventilate the booth, wear an organic-vapour respirator, and ground guns to prevent static.
Rack (Hanger) Painting junior - Close-up of the working zone - QLQ workshop photo
Close-up of the working zone — QLQ workshop photo

FAQ

Why do runs start at part bottoms?
Film build on verticals exceeds sag resistance. Cut viscosity or split into lighter passes.
How long between coats?
Tack-free time, typically 5–10 minutes ambient; longer when humid.
Why does paint lift at contact points?
Masking failed or hanger contact was oily. Clean contacts and re-mask with heat-grade tape.
Previous Post
Sag And Runout On Vertical Surfaces | Rack (Hanger) Painting Intermediate Guide
Next Post
Tumble Paint Line Capacity Planning | Tumble Painting Management Guide