Scope of this guide
This management guide translates the process into cost, risk and throughput: what to measure, what to audit and where the money leaks.
Process: Mould Maintenance. Figures in this guide are industry-standard starting ranges; confirm against your supplier TDS before locking settings.
Working ranges and control points
The table below is the daily reference for a mould shop. Set by the card, verify by the control point column.
| Parameter | Typical range | Control point | Watch out |
|---|---|---|---|
| Try-out shot count | 20–50 shots per try | Dimensional first-article | Judge on stable shots only |
| Vent depth | 0.01–0.03 mm zinc | Vent impression check | Deep vents flash heavy |
| Polish direction | Along ejection | Ra reading at gates | Cross polish drags filling |
| Cooling flow | Turbulent, per circuit | Flow meter per circuit | Laminar flow warps parts |
| Slide clearance | Per die spec ±0.02 | Blue-check slides | Wear makes mismatch flash |
Run It As A Business: the management view
Beyond the basic card, this is the layer that matters at your level:
| Cost line | What drives it | Metric to track | Typical lever |
|---|---|---|---|
| Chemicals | Drag-out and bath dumps | Cost per 1000 parts | Rinse counter-flow, drip bars |
| Rework | First-pass yield losses | FPY by defect family | Fix top family first |
| Energy | Heated tanks and idle time | kWh per 1000 parts | Covers, night setback |
| Claims | Escape rate | PPM by customer | Ship gate on FPY |
Standard routine
- Clean cores with soft tools — steel scratches vent lands
- Blue-check slides at every service
- Log flow per cooling circuit at each pull
- Photograph vent lands after cleaning
- First-article dimension after every repair

Engineer notes
- Most flash is slide or parting-line wear, not clamp tonnage
- Vent maintenance beats injection-speed tuning for porosity
- Cooling balance decides warp; one clogged circuit hides in averages
- Polish marks copy onto castings — polish along ejection
- Spare cores for the two hottest cavities save the most downtime
Safety: Mould handling needs rated slings and clear floors. A dropped insert is a scrapped tool and a foot injury.

FAQ
Where should I look first when flash appears?
Parting line and slides with a blue check — wear shows before dimension drift.
How often should vents be cleaned?
Every 10–20k shots for zinc, sooner with hot runner gates.
Why does one cavity warp parts?
Its cooling circuit is partly blocked; flow-meter each circuit, not just the inlet.
Which single metric should I start reporting weekly?
First-pass yield by defect family; it exposes rework cost and points at the largest lever.