The question every buyer asks
Switching plating suppliers does not keep old salt-spray reports valid — any process or material change voids prior verification. The lower the new supplier's price, the more urgently re-validation and compliance audits matter.
Parameters are industry-standard starting ranges; confirm against your supplier TDS.

How we handle it on the line
- Rule: a change of supplier (new process, new materials, new baths) requires re-verification; old reports describe the old supplier's line, not the new one.
- Put verification cost allocation in the contract — borne by the party who initiated the change.
- Low-price supplier risk 1: non-compliant hazardous-waste disposal — environmental liability propagates up the supply chain to the brand.
- Low-price supplier risk 2: skipped or shortened pre-treatment — latent adhesion failures.
- Low-price supplier risk 3: baths run past maintenance intervals — batch-to-batch variation.
- Audit checklist, three items: discharge permit, hazardous-waste transfer manifests, bath-maintenance records.
- QLQ's quotes include compliance costs and welcome audits at any time — when low price is bought with compliance, the resulting claims far exceed the difference.

Honest boundaries
- Re-verification covers defined part families and conditions only; later design or substrate changes void it again.
- An audit snapshot proves compliance at that moment; ongoing diligence needs periodic re-checks.
- Old reports may still serve as reference data for the previous supplier's parts — they validate nothing about the new line.
FAQ
We changed plating suppliers — are the old salt-spray reports still valid?
No. Any change of process, materials or baths voids prior verification. Re-test on the new supplier's line and put verification costs on whoever initiated the change.
What are the real risks of choosing the cheapest plating supplier?
Non-compliant hazardous-waste disposal (liability reaches your brand), skipped pre-treatment causing adhesion failures, and over-extended baths causing batch variation.
What should I check when auditing a new plating supplier?
Three items: valid discharge permit, hazardous-waste transfer manifests, and bath-maintenance records. QLQ welcomes audits anytime and prices compliance into quotes.
The price difference was small — is skipping re-verification acceptable risk?
Not advisable: when low price is achieved by cutting compliance, eventual claims and recalls far exceed the saving. Contract the verification cost to the party driving the change.