Professional Zinc Alloy Surface Finishing Solutions
Plating Rack Coating Powder
Plating Rack Coating Powder
Gerar código QR
-
Shipping & lead time: contact us for a quote. Packing and delivery terms depend on the product and destination.
Product description
Shipping & Return
Product Overview
Plating Rack Coating Powder is a professional plating salt supplied by QLQ for zipper, hardware and metal-finishing plants. Standard packing: 25KG/BAG. Regular supply for customers in Bangladesh, Pakistan, India and other markets, with export-standard packing and documentation.
Product Identity (Encyclopaedia Card)
| Property | Value |
|---|---|
| Chemical name | Plating Rack Coating Powder |
| Chemical formula | PVC plastisol coating powder |
| CAS number | Mixture |
| Appearance | White to light grey fine powder |
| Grade / type | Rack insulation coating |
| Standard packing | 25 kg PP woven bag or kraft paper bag with PE inner liner; 25 kg fibre drum |
What it is and what it does. Plating rack coating powder is the PVC plastisol powder used to insulate plating racks and jigs so that only the part, and not the rack, is plated.
- White to light grey fine powder, applied by heating the cleaned rack and dipping it into the fluidised powder bed.
- Proper insulation stops the rack from stealing current and from plating over, which causes burnt contact points and uneven deposits.
- The coating must be stripped back from the contact tips, otherwise the parts make no electrical contact.
Typical Use in a Plating / Finishing Line
| Item | Typical guidance |
|---|---|
| Coating | Preheat the rack to the supplier schedule, dip in the fluidised bed, then cure |
| Film thickness | Typically 0.5-1.5 mm depending on the rack and the process |
| Stripping | Mechanical or thermal stripping of the contact tips after coating |
| Control | Visual inspection plus an insulation check with the rack in the bath |
Safety, Handling & Storage
| Item | Requirement |
|---|---|
| Hazard classification | Not classified as dangerous substance; damaged plating rack coating must be treated as a plating waste |
| Personal protective equipment | Gloves and safety glasses for workshop handling |
| Spill / first aid | Not applicable |
| Storage | Dry store, keep flat and clean; avoid oil contamination of anodes |
| Transport | Classified and packed according to IATA/IMDG for the hazard class; UN number and packing group stated on the shipping documents |
Quality Documents Shipped With Every Batch
| Document | Comment |
|---|---|
| COA (certificate of analysis) | Provided with the shipment; batch traceable to the production date |
| MSDS (safety data sheet) | Provided with the shipment; batch traceable to the production date |
| Packing list | Provided with the shipment; batch traceable to the production date |
| Commercial invoice | Provided with the shipment; batch traceable to the production date |
| Certificate of origin on request | Provided with the shipment; batch traceable to the production date |
Buyer Questions We Answer Every Week
| Question | Answer |
|---|---|
| Why do the contacts plate over? | The plastisol has covered the contact tips; strip them back to bare copper before using the rack. |
| How long does the coating last? | Months to years depending on the bath chemistry; chromic acid and hot alkaline baths degrade it fastest. |
| Product Name | Plating Rack Coating Powder |
| Category | Plating Salt |
| Standard Packing | 25KG/BAG |
| Net Weight | 25 KG per bag |
| Appearance | White to off-white crystalline powder or granules |
| MOQ | 1 drum / 1 bag |
| Delivery | 7-15 days after payment confirmation |
Key Specifications
| Item | Value |
|---|---|
| Purity / Assay | Industrial grade, COA available on request |
| Packaging Material | Woven bag with PE liner |
| Shelf Life | 12 months in sealed original packing |
| Origin | China |
| Documents | COA, MSDS, packing list, commercial invoice |
Packing & Storage
| Condition | Requirement |
|---|---|
| Temperature | 5-35 °C, away from direct sunlight |
| Humidity | Dry, ventilated warehouse; keep sealed against moisture |
| Stacking | Max 4 layers for drums, follow pallet markings for bags |
| Shelf Check | FEFO - first expired, first out |
Precautions
- Wear chemical-resistant gloves and safety goggles when handling
- Read MSDS before first use; keep away from incompatible materials
- Spill: collect with inert absorbent, do not wash into drains
- Store locked, out of reach of untrained personnel
FAQ
| Question | Answer |
|---|---|
| Can you provide COA / MSDS? | Yes, COA and MSDS are provided with every shipment. |
| What is the MOQ? | MOQ is 1 bag / 1 drum. Mixed loading of different chemicals is accepted. |
| Do you provide dosing guidance? | Yes, QLQ engineers provide free bath set-up and dosing consultation based on Hull-cell results. |
| How about shipping? | 7-15 days by sea or air depending on quantity and destination port. |
Shipping cost is based on weight. Just add products to your cart and use the Shipping Calculator to see the shipping price.We want you to be 100% satisfied with your purchase. Items can be returned or exchanged within 30 days of delivery.
Specifying Plating Rack Coating Powder for your line
Send the four details below and we confirm fit, packing and price the same working day.
- Application: which tank or process it serves.
- Dimensions or capacity: drawing preferred.
- Material: where it contacts chemicals or heat.
- Quantity: first order and expected annual use.
| What you send | What you get back |
|---|---|
| Part drawing or sample | Compatibility check and recommended settings |
| Output target per shift | Capacity, tank or rack count, manpower |
| Finish spec with tolerance | Control points and acceptance tests |
| Site conditions (power, water, space) | Layout proposal and utility requirements |
Buying questions we answer most
What is the minimum order quantity?
One carton or one unit for most items. Trial quantities are quoted separately from production volumes.
Can it be customised?
Dimensions, material and surface treatment can be adapted. Send a drawing or a sample and we confirm what changes and what stays standard.
What is the lead time?
Stock items ship within a week of confirmation; made-to-order items typically 20-35 days.
What documentation comes with the shipment?
Packing list, material certificate where applicable, and export documents prepared per destination.
Put Plating Rack Coating Powder into a process
- Process overview - how each stage connects
- Plating workshop - rack and barrel line layout
- Painting workshop - spray, cure and colour control
- Product overview - what else the line needs