Tumble Line Throughput Planning: Batches, Media Life and Capacity
Planeamento da fábrica e da capacidade

Tumble Line Throughput Planning: Batches, Media Life and Capacity

Tumble Line Throughput Planning: Batches, Media Life and Capacity.

A working reference designed to be printed and used at the line. It complements the failure case studies in the Technician Hub with the standard documents those cases eventually produced.

Media wear check
Every batch unload
Load chart
Posted at each drum
Color sequence
Light to dark
Tumble painting drums for small hardware batches
Tumble painting drums for small hardware batches

Common Mistakes and How to Avoid Them

MistakeWhy It HappensPractical Fix
1. Reusing worn media blindlyWorn media marks and carries colorWear check each unload; top up by rule
2. Random color orderDark-to-light causes carryover claimsSequence light to dark; dedicated media per family

Best Practices

  • Media wear card at each drum
  • Color sequence posted
  • Batch records with media age

Batch Run Sequence

  1. Media wear check - Size, shape, color load (Worn media marks parts)
  2. Load per chart - Weight and ratio (Overload stops tumbling)
  3. Run and record - Cycle time vs chart (Drift signals media aging)

Cards at each drum | Light-to-dark color order

Tumble Line Reference

Media and cycle windows for tumble painting of small parts.

ParameterReferenceWhy It Matters
Media/part ratioPer loading chartToo little marks; too much hides
Cycle timePer time studyDrift signals media aging
Media wear top-upPer batch countKeeps finish consistent
Color orderLight to darkPrevents carryover claims

Media cards ended the carryover claims

Scenario. Light-colored parts picked up dark specks after color changes.

Action. Wear cards per drum and light-to-dark batch sequencing.

Result. Carryover claims stopped; media life became predictable.

Frequently Asked Questions

How do I know media is worn?

Size loss, rounded edges and loaded color. Check every unload against the card.

Why light-to-dark sequencing?

Dark media particles show on light parts. Sequencing prevents carryover without extra cleaning.

What does cycle time drift mean?

Usually media aging or wrong load ratio. Check both against the loading chart.

Implementation Roadmap

StepFrequency
Media cards liveEvery batch
Load charts builtWeek 1-2
Throughput planMonth 1

What Would You Like to Solve?

If you would like this checklist or template adapted to your own line and part mix, contact QLQ we supply the full equipment and chemistry package along with the working documents that make it run.

Tumble Painting LineMANAGEMENTTumble Line Throughput Planning: Batches, Media Life and CapacityOperatorFill 30-40% of the drum - more parts means partssticking together.ChemistPaint 3-6% by weight of parts. Weigh it, never guess it.QCKeep a retention sample for every batch - colourdisputes end with samples.ManagerPaint per kg of parts is the cost line to track everyweek.STEP 1Load DrumFill 30-40%Part mixWeight check1STEP 2Paint InjectPaint 3-6% wt8-15 rpm2-8 min2STEP 3Spin & TumbleDistribute 5-10 minUniform filmNo tack3STEP 4Dry & SeparateAir dry 30-60 minSieveBatch sample4STEP 5QC & PackFilm gaugeColour matchRetention sample5!Bald spots are almost always too little paint, not too little spin.COMMON MISTAKES vs WHAT WORKSfrom shop-floor auditsxOverfill the drum to raise outputv30-40% fill; parts must separatexGuess the paint weightv3-6% of part weight, weighed every batchxShip without a retention samplevKeep one sample per batch8-15 rpmSpin5-10 minDistribute> 97%YieldCASE FROM THE LINECase: a colour dispute was settled by the retention sample from batch 12.QLQ Surface Treatment | steps, roles, checkpoints, mistakes and a real case
Tumble Painting Line - process board with operator, chemist, QC and management notes, mistakes and a case.

FAQ - Tumble Line Throughput Planning: Batches, Media Life and Capacity

Straight answers from the shop floor. Ask us on WhatsApp if your case is different.

How do I fix it on the line?
Action. Wear cards per drum and light-to-dark batch sequencing.
What must be checked before running?
A working reference designed to be printed and used at the line. It complements the failure case studies in the Technician Hub with the standard documents those cases eventually produced.
What result should I expect?
Result. Carryover claims stopped; media life became predictable.