Professional Zinc Alloy Surface Finishing Solutions
Phosphating
Phosphating

Phosphating is a key pretreatment procedure. Its core functions are to improve the adhesion of subsequent coatings, enhance corrosion resistance and optimize the surface microstructure. The phosphating film is a chemical conversion film (non-electroplated layer) with a typical thickness of 0.5–5μm and gray/blue-green appearance. It has no decorative effect and is only used for functional substrate protection
1. Process Flow Chart
2. Process Video
3. Process Details

1. Tank Solution Preparation
Dilute the phosphating agent with water at a ratio of 1:20, temperature: 25–40℃ (normal & low temperature phosphating system).

2. Core Phosphating Operation
Small zinc alloy parts are uniformly treated by immersion method, suitable for workpieces with complex structures, small holes and gaps. 1.Load the workpieces into dedicated plastic hanging baskets or stainless steel hangers, and fully immerse them in the phosphating tank solution to ensure full contact of all surfaces with the solution; 2.Soak at constant temperature for 20–60 seconds, and lift the workpiece gently 2–3 times during the process to discharge trapped air bubbles in gaps and blind holes and prevent missing phosphating; 3.Take out the workpiece stably after soaking, and check that a uniform and delicate gray phosphate conversion film is formed on the surface.

3. Post-phosphating Treatment
Rinse the workpieces with running clean water to completely remove residual phosphating solution on the surface.

4. Remove Surface Moisture
Place the workpieces into the machine to thoroughly remove surface moisture. High-temperature baking is strictly prohibited, as it may cause coating cracking and substrate deformation.
Get a Free Quote Today
Send us your samples or drawings — our engineers reply within 24 hours with pricing and technical advice.
Contact Us
Workshop Planning Data
Phosphating — Data Zinc Alloy Finishing Managers Need
Zinc phosphating builds a micro-crystalline conversion layer that doubles paint and e-coat adhesion and delivers 72-120 h neutral salt spray on zinc alloy hardware before painting.
240 m²Workshop Area
8 peopleTeam Size
92 kWInstalled Power
400-700k pcs/dayDaily Output (10 h)
Quality Inspection & Control
| Check item | Method | Acceptance standard |
|---|---|---|
| Coating weight | Weigh difference (0.1 mg) | 1.5-3.0 g/m² for paint base |
| Crystal size | SEM / microscope | Fine, uniform crystals 3-10 μm |
| Salt spray (before paint) | NSS chamber | ≥ 72-120 h no red rust |
| Adhesion | Cross-cut + tape pull | Rating 0-1 (ISO 2409) |
| Bath parameters | Titration / pH meter | FA 0.8-1.5 pt, TA 18-25 pt, pH 2.0-3.0 |
| Sludge & bath life | Visual + filter check | Sludge settled; bath replaced per schedule |
Workshop Layout & Floor Area
| Zone | Area |
|---|---|
| Phosphating tank line | 100 m² |
| Rinse stages + DI | 45 m² |
| Chemical storage / dosing | 30 m² |
| QA lab | 25 m² |
| Utility & locker | 40 m² |
| Total workshop | 240 m² |
Manpower & Shift Plan
| Role | Headcount |
|---|---|
| Line operators | 4 |
| Chemical technician | 1 |
| QC inspectors | 2 |
| Supervisor / maintenance | 1 |
| Total (2 shifts × 10 h) | 8 |
Power & Utility Demand
| Equipment | Demand |
|---|---|
| Bath heating (60-75 °C) | 38 kW |
| Pumps & dosing pumps | 10 kW |
| Exhaust system | 8 kW |
| DI water plant | 9 kW |
| Air compressor | 11 kW |
| Dryer + lighting | 16 kW |
| Installed total | 92 kW |
| Typical running load | ≈ 72 kW |
Production Flow Chart
DegreaseAlkaline degrease 60 °C, 5 min
Rinse2-stage counter-flow rinse
Acid Activation1-2% acid, 30-60 s
PhosphatingZinc phosphate 40-50 °C, 8-12 min
Final Rinse + DIDI rinse < 30 μS/cm
Dry & QCDry 80-110 °C, check coating weight
Daily Capacity — 10-Hour Operating Day
| Parameter | Value |
|---|---|
| Cycle time | 30-45 min |
| Load per batch | 60-100 kg |
| Batches per 10 h day | 12-16 |
| Daily output | 400,000-700,000 pcs |
| Monthly output (26 days) | 10-18 million pcs |
Output Value Estimate
| Parameter | Value |
|---|---|
| Processing fee per piece | USD 0.002-0.005 |
| Daily output value (10 h) | USD 1,000-2,200 |
| Monthly output value | USD 26,000-57,000 |
| Annual output value | USD 310,000-680,000 |
Related Products — Complete Phosphating Solution
Machines, chemicals and consumables selected from the real QLQ product range for this process. Every product page is live and ready to quote.
Automatic washing tank is suitable for rack plating, electrophoresis, and pretreatment.
Machine & Equipment
QLQ-ASBM Automatic Sand Blasting Machine
Machine & Equipment
QLQ-APM Automatic phosphating machine
Machine & Equipment
Tea Seed Powder
Chemical & Coating
Porcelain Refined Polishing Stone
Consumable & Accessory
Aluminum and Porcelain Oblique and Round Column Refined Polishing Stone
Consumable & Accessory
Triangle Shape Rough Polishing Stone
Consumable & Accessory