collection-banner-image collection-banner-image

Professional Zinc Alloy Surface Finishing Solutions

Postbehandling för rackplattning

Post-Treatment: Passivation, E-Coating & Sealing

Plating gives the look — post-treatment decides how long it keeps it. The 6-step finishing system that takes salt spray from 24 h to 200+ h.

Modern indoor electrophoretic coating production line with overhead conveyor and processing tanksConceptual illustration based on reference photographs; not test evidence.

The 6-Step Post-Treatment Line

Every step after the plating bath, before the box

1DI Water Final Rinse

Deionized water removes residual salts that cause spotting and under-film corrosion. Tap water at this stage = future rust stains.

Key Parameters
Water quality: < 10 μS/cm
Stages: 3–5 counter-current
White industrial multi-compartment plating rinse tank with waterConceptual illustration based on reference photographs; not test evidence.

2Passivation / Sealing

Conversion coating that blocks corrosion initiation. Chromate for maximum protection, trivalent or organic for REACH compliance.

Key Parameters
Salt spray gain: +24 to +120 h
Options: Cr³⁺ / organic

3E-Coating (Electrophoretic)

Charged paint particles wrap every edge and recess. Clear, black or custom colors.

Key Parameters
Thickness: 15–25 μm
Cure: 160–180 °C, 20–30 min

4Controlled Drying

Forced-air drying below the water-spot threshold. Humidity-controlled tunnel, not open-air racks.

Key Parameters
Temp: 60–80 °C
Time: 10–15 min

5Final QC

D65 visual check, XRF thickness audit, cross-cut adhesion, and salt-spray coupon from every batch.

Key Parameters
Adhesion: ISO 2409
Sampling: per batch

6Anti-Tarnish Packaging

VCI bags or anti-tarnish tissue + desiccant. Correct packaging doubles shelf life before your customer even opens the box.

▼

Protection Levels Compared

Hours of salt spray per treatment stack

Treatment StackSalt SprayLookCostUse Case
As-plated (bare)24–48 hAs-plated—Indoor, short shelf life
Chromate passivation48–96 hSlight iridescenceLowGeneral hardware
Trivalent / organic sealer48–72 hClear, unchangedMediumEU / REACH orders
Clear e-coat96–200+ hGlossy clearHighPremium & outdoor
Color e-coat96–200+ hOpaque colorHighFashion statements
Lacquer on antique48–120 hSatin, freezes patinaMediumAntique finishes
Powder coating200–500+ hThick opaqueVery highIndustrial / marine

📌 Post-Treatment Cheat Sheet

DI rinse quality< 10 μS/cm
E-coat thickness15–25 μm
E-coat cure160–180 °C / 20–30 min
Best outdoor stackNi + e-coat = 200+ h
REACH sealerCr³⁺ or organic
PackagingVCI + desiccant
💡 Compliance, HandledAll sealers and e-coats meet EU REACH and RoHS. Hexavalent-chromium-free passivation is our default. Compliance documents ship with your order for customs.

FAQ

Best stack for outdoor products?
Nickel base + clear e-coat (200+ h salt spray). Marine environment: ask for our duplex system with an extra seal layer.
Does passivation change the color?
Chromate adds slight iridescence; trivalent and organic sealers are visually clear. E-coat adds gloss and slightly deepens tone.
How long does e-coat last?
3–5 years indoors, 1–3 years outdoors. UV-stable formulations available for prolonged exposure.
Custom e-coat colors?
Black and white standard; custom tints at 500 L batch minimum plus a color-matching fee.

Get a Free Quote Today

Send us your samples or drawings — our engineers reply within 24 hours with pricing and technical advice.

Contact Us