Rack Plating Technician - Intermediate

Who pays for racks? Marking contact points on drawings | QLQ

The question every buyer asks

Rack ownership and contact-point marking look like shop-floor trivia until the first acceptance dispute over un-plated marks. The honest rule: whoever funds the rack owns its design, and contact points must be on the drawing — or disputes are unsolvable.

Parameters are industry-standard starting ranges; confirm against your supplier TDS.

Who pays for racks? Marking contact points on drawings - QLQ workshop - QLQ workshop photo
QLQ workshop — QLQ workshop photo

How we handle it on the line

  • Ownership mode 1: customer-funded racks belong to the customer; contact points follow the customer's drawing.
  • Ownership mode 2: supplier-funded racks belong to the supplier; the supplier sets contact positions but must get written confirmation that no appearance face is affected.
  • Ownership mode 3: cost sharing between customer and supplier, agreed per project.
  • Contact points (the un-plated marks) must be marked on the drawing — without them, acceptance disputes have no resolution basis.
  • Standard practice: choose non-appearance faces or positions removed by later machining.
  • QLQ convention: new-rack costs are either amortized into order quantity or bought out; contact-point positions are countersigned on both parties' drawings and never moved in production.
Who pays for racks? Marking contact points on drawings - Process close-up - QLQ workshop photo
Process close-up — QLQ workshop photo

Honest boundaries

  • Some part geometries leave no fully invisible contact position — the trade-off must be agreed in writing up front.
  • Rack wear can shift contact behavior over time; rack maintenance responsibility should follow ownership.
  • Amortized rack costs are transparent in the quote but not separately refundable unless bought out.

FAQ

Who should pay for plating racks — us or the supplier?
Three models: customer-funded (customer owns, contact points per customer drawing), supplier-funded (supplier designs but confirms no appearance-face impact in writing), or cost-shared. Pick one and write it down.
Where should plating contact points be marked on my drawing?
On non-appearance faces or areas removed by later machining — and they must be marked. Unmarked contact points make acceptance disputes unsolvable.
The supplier moved the contact points and now marks show on a visible face — what recourse?
If positions were countersigned on drawings, that is a supplier breach. Insist on joint drawing sign-off: QLQ countersigns contact points with customers and never moves them in production.
Can rack costs be included in the unit price instead of paid upfront?
Yes — QLQ amortizes new-rack costs into order quantity or offers buyout, both stated transparently in the quotation.
Bag hardware fading: quality issue or normal wear? | QLQ
Changing plating suppliers: are old test reports still valid? | QLQ