Mould Technician - Management

Mould Maintenance Schedule And Spare Cost | Mould Maintenance Management Guide

Scope of this guide

This management guide translates the process into cost, risk and throughput: what to measure, what to audit and where the money leaks.

Process: Mould Maintenance. Figures in this guide are industry-standard starting ranges; confirm against your supplier TDS before locking settings.

Working ranges and control points

The table below is the daily reference for a mould shop. Set by the card, verify by the control point column.

ParameterTypical rangeControl pointWatch out
Try-out shot count20–50 shots per tryDimensional first-articleJudge on stable shots only
Vent depth0.01–0.03 mm zincVent impression checkDeep vents flash heavy
Polish directionAlong ejectionRa reading at gatesCross polish drags filling
Cooling flowTurbulent, per circuitFlow meter per circuitLaminar flow warps parts
Slide clearancePer die spec ±0.02Blue-check slidesWear makes mismatch flash

Run It As A Business: the management view

Beyond the basic card, this is the layer that matters at your level:

Cost lineWhat drives itMetric to trackTypical lever
ChemicalsDrag-out and bath dumpsCost per 1000 partsRinse counter-flow, drip bars
ReworkFirst-pass yield lossesFPY by defect familyFix top family first
EnergyHeated tanks and idle timekWh per 1000 partsCovers, night setback
ClaimsEscape ratePPM by customerShip gate on FPY

Standard routine

  1. Clean cores with soft tools — steel scratches vent lands
  2. Blue-check slides at every service
  3. Log flow per cooling circuit at each pull
  4. Photograph vent lands after cleaning
  5. First-article dimension after every repair
Mould Maintenance management - Live line operation - QLQ workshop photo
Live line operation — QLQ workshop photo

Engineer notes

  • Most flash is slide or parting-line wear, not clamp tonnage
  • Vent maintenance beats injection-speed tuning for porosity
  • Cooling balance decides warp; one clogged circuit hides in averages
  • Polish marks copy onto castings — polish along ejection
  • Spare cores for the two hottest cavities save the most downtime
Safety: Mould handling needs rated slings and clear floors. A dropped insert is a scrapped tool and a foot injury.
Mould Maintenance management - Close-up of the working zone - QLQ workshop photo
Close-up of the working zone — QLQ workshop photo

FAQ

Where should I look first when flash appears?
Parting line and slides with a blue check — wear shows before dimension drift.
How often should vents be cleaned?
Every 10–20k shots for zinc, sooner with hot runner gates.
Why does one cavity warp parts?
Its cooling circuit is partly blocked; flow-meter each circuit, not just the inlet.
Which single metric should I start reporting weekly?
First-pass yield by defect family; it exposes rework cost and points at the largest lever.
上一篇
Anodizing Racking Tightness Basics | Anodizing Junior Guide
下一篇
Mould Vent Design Vs Porosity Data | Mould Maintenance Senior Guide