collection-banner-image collection-banner-image

Professional Zinc Alloy Surface Finishing Solutions

الألوان الخاصة

Speical color

1. Process Flow Chart

Speical color - image 1

2. Process Video

3. Process Details

After preprocessing and nickel plating, the next step is:

1. Oil removal electrolysis

1. Oil removal electrolysis

2. Three times Cleaning Tank

2. Three times Cleaning Tank

Remove residual liquid on the workpiece surface.

3. Dull nickel for 1 minute

Removing the brightness of nickel

4. Three times Cleaning Tank

4. Three times Cleaning Tank

Remove residual liquid on the workpiece surface.

5. Chromium plating

6. Two-grid recovery tank

6. Two-grid recovery tank

7. Six times Cleaning Tank

7. Six times Cleaning Tank

Remove residual liquid on the workpiece surface.

Get a Free Quote Today

Send us your samples or drawings — our engineers reply within 24 hours with pricing and technical advice.

Contact Us
Workshop Planning Data

Speical color — Data Zinc Alloy Finishing Managers Need

The rack plating line handles larger zinc alloy parts, sliders on frames and parts requiring precise current distribution — high-end finishes with zero contact marks and excellent throwing power.

800 m²Workshop Area
26 peopleTeam Size
330 kWInstalled Power
300-600k pcs/dayDaily Output (10 h)

Quality Inspection & Control

Check itemMethodAcceptance standard
Coating thicknessX-ray / coulometricCu 5-12 μm, Ni 5-15 μm per spec
AdhesionBend + thermal shockNo blister at 150 °C × 30 min
Color & glossColorimeter / gloss meterΔE ≤ 1.0, gloss per customer card
Contact marksVisual 10×Zero rack contact marks on A-surface
Salt sprayNSS chamber12-96 h per spec
Throwing powerCross-section microMinimum:maximum thickness ≥ 1:1.6

Workshop Layout & Floor Area

ZoneArea
Rack line (16-20 tanks)320 m²
Rack loading / unloading90 m²
Rectifier & control room50 m²
QA lab + microscope60 m²
Rack maintenance60 m²
Chemical store60 m²
Waste treatment120 m²
Utility & lockers40 m²
Total workshop800 m²

Manpower & Shift Plan

RoleHeadcount
Rack loaders / operators12
Chemical technicians3
QC inspectors3
Rack maintenance2
Wastewater operator1
Supervisor1
Maintenance / electrician2
Logistics2
Total (2 shifts × 10 h)26

Power & Utility Demand

EquipmentDemand
Rectifiers 0-15 V × 1000-3000 A120 kW
Tank heating / cooling70 kW
Hoist / transporter system30 kW
Pumps / filters / dosing38 kW
Exhaust + scrubber25 kW
Dryer / oven22 kW
Wastewater treatment20 kW
Lighting & auxiliary5 kW
Installed total330 kW
Typical running load≈ 260 kW

Production Flow Chart

PretreatmentHand / barrel polish, degrease
Rack LoadingLoad parts on plated copper racks
Copper Strike & BuildAlkaline Cu → acid Cu
Nickel / Color PlatingBright Ni, gold, gun, black etc.
Rinse ChainRecovery → DI rinse
Dry / Unload / QCOven dry, unload, inspect, pack

Daily Capacity — 10-Hour Operating Day

ParameterValue
Cycle per flight bar35-60 min
Parts per flight bar3,000-8,000
Flight bars per 10 h day14-18
Daily output300,000-600,000 pcs
Monthly output (26 days)8-15 million pcs

Output Value Estimate

ParameterValue
Plating fee per pieceUSD 0.015-0.04
Daily output value (10 h)USD 8,000-18,000
Monthly output valueUSD 210,000-470,000
Annual output valueUSD 2,500,000-5,600,000

Related Products — Complete Speical color Solution

Machines, chemicals and consumables selected from the real QLQ product range for this process. Every product page is live and ready to quote.