Professional Zinc Alloy Surface Finishing Solutions
Barrel plating process
Barrel plating process
Δημιουργία QR κώδικα
-
Shipping & lead time: contact us for a quote. Packing and delivery terms depend on the product and destination.
Product description
Shipping & Return
Barrel Plating Complete Process Flow
Overall Flow
Raw Material
↓
① Pre-treatment
↓
② Alkaline Cu → ③ Acid Cu → ④ Ni/Sn → ⑤ Gun Color
↓
⑥ Chrome → ⑦ Gold → ⑧ Custom Colors
↓
⑨ Post-treatment
↓
Finished Product
↓
① Pre-treatment
↓
② Alkaline Cu → ③ Acid Cu → ④ Ni/Sn → ⑤ Gun Color
↓
⑥ Chrome → ⑦ Gold → ⑧ Custom Colors
↓
⑨ Post-treatment
↓
Finished Product
Step 1: Pre-treatment (Polishing, Degreasing, Pickling, Activation, Drum Change)
Basic pre-plating treatment to ensure coating adhesion, flatness and cleanliness, the core premise of electroplating quality.
Core Processes
- Loading → Put into barrel polishing drum (non-conductive)
- Barrel Polishing/Buffing: Deburring, chamfering, leveling
- Screening & Slag Removal → Transfer to turnover frame
- Chemical Degreasing → Electrolytic Degreasing (Wax & Oil Removal)
- Acid Pickling for Rust Removal → Multi-stage Water Washing
- Activation → Pure Water Washing (Final Pre-plating Wash)
Containers/Equipment Used
Barrel polishing drum, turnover frame, degreasing tank, pickling tank, activation tank, pure water washing tank, barrel plating drum
Key Quality Control Points
- No polishing wax, no oil contamination, no oxide scale
- Adequate water washing, no cross-tank contamination
- Barrel plating drum with moderate loading capacity and good conductivity
Applicable Products
All small parts requiring barrel plating: Zipper sliders, dog buckles, screws, snaps, hardware decorative parts
Step 2: Alkaline Copper Plating
Base coating with good coverage, improving adhesion between substrate and subsequent coatings.
Core Processes
- Barrel plating drum into alkaline copper tank
- Electrified deposition of alkaline copper base layer
- Recovery Water Washing → Pure Water Washing Transition
Containers/Equipment Used
Alkaline copper plating tank, barrel plating drum, conductive system, circulation filtration
Key Quality Control Points
- Uniform thickness, no missed plating, no burning
- Stable current, pH value and temperature
Applicable Products
Base coating for iron substrate and zinc alloy substrate hardware
Step 3: Acid Copper Plating
Bright acid copper plating, filling fine lines, improving surface brightness and flatness.
Core Processes
- Barrel plating drum into acid copper tank
- Control current, temperature and drum rotation speed
- Multi-stage water washing to prevent residue
Containers/Equipment Used
Bright acid copper tank, barrel plating drum, temperature control system
Key Quality Control Points
- Strong mirror effect, no pitting, no pinholes
- Good leveling property, covering fine scratches
Applicable Products
High-end appearance parts: Zipper sliders, bag buckles, decorative hardware
Step 4: Nickel/Tin Plating
Nickel: Anti-corrosion, wear-resistant, barrier layer; Tin: Solderable, soft protection, anti-oxidation.
Core Processes
- Barrel plating drum into nickel tank (bright nickel/matte nickel) or tin tank
- Control time and current according to thickness requirements
- Water washing transition to next process
Containers/Equipment Used
Nickel plating tank/tin plating tank, barrel plating drum, filter
Key Quality Control Points
- Reach thickness standard, corrosion-resistant, no peeling
- Uniform color, no blackening or blooming
Applicable Products
Hardware fasteners, small electronic parts, parts requiring wear/ corrosion resistance
Step 5: Gun Color Plating
Decorative alloy plating (Ni-Co series), gun black/matte gray, mainstream color for high-end bag hardware.
Core Processes
- Barrel plating drum into gun color tank
- Electrified coloring, control uniform color
- Water washing, anti-tarnish treatment
Containers/Equipment Used
Gun color plating tank, barrel plating drum, temperature control equipment
Key Quality Control Points
- Uniform color, no yellowing, no blooming
- Good adhesion, no color fading
Applicable Products
Zipper sliders, dog buckles, high-end apparel hardware
Step 6: Chrome Plating
Surface decorative chrome plating, high brightness, high hardness, wear-resistant, fingerprint-resistant, strong corrosion resistance.
Core Processes
- Barrel plating drum into decorative chrome tank
- Short-time electrification, thin chrome deposition
- Quick water discharge, adequate water washing
Containers/Equipment Used
Decorative chrome tank, barrel plating drum, ventilation system
Key Quality Control Points
- Uniform brightness, no chrome peeling, no cracking
- No bottom exposure, no fogging
Applicable Products
Exposed bright decorative parts, high-end hardware buckles
Step 7: Gold Plating
High-end decoration + electrical contact function, anti-oxidation, corrosion-resistant, noble color.
Core Processes
- Barrel plating drum into gold plating tank
- Control time according to thin gold/thick gold requirements
- Pure water washing, anti-oxidation treatment
Containers/Equipment Used
Gold plating tank, barrel plating drum, pure water system
Key Quality Control Points
- Pure color, uniform thickness, no bottom exposure
- Anti-oxidation, no darkening
Applicable Products
High-end jewelry, precision electronics, high-grade hardware
Step 8: Other Color Plating (Custom Colors)
Meet customers' customized appearance needs, provide diversified color options.
Core Colors/Processes
- Pearl nickel, pearl chrome, matte series
- Antique copper, red copper, antique color
- Two-tone plating, electrophoretic coloring
- Customize process according to customer color card
Containers/Equipment Used
Special tank for corresponding color, barrel plating drum
Key Quality Control Points
Consistent color accuracy, stable batches, traceable
Applicable Products
Brand-customized hardware, differentiated appearance parts
Step 9: Post-treatment
Protection, stabilization, drying and inspection after electroplating to ensure finished products are corrosion-resistant, beautiful and qualified.
Core Processes
- Multi-stage pure water washing (prevent residue, whitening, white rust)
- Passivation/Sealing (enhance corrosion resistance, color protection, anti-tarnish)
- Hot air drying (dehydration and rust prevention)
- Unloading from barrel plating drum
- Full inspection: Appearance, thickness, salt spray, adhesion
Containers/Equipment Used
Water washing tank, sealing tank, drying oven, barrel plating drum, inspection table
Key Quality Control Points
- Thorough drying, no water marks, no white rust
- Uniform sealing, meet salt spray resistance standard
- Uniform appearance, no defects
Applicable Products
Final treatment for all barrel-plated finished products
Shipping cost is based on weight. Just add products to your cart and use the Shipping Calculator to see the shipping price.We want you to be 100% satisfied with your purchase. Items can be returned or exchanged within 30 days of delivery.
Specifying Barrel plating process for your line
Four details decide whether this machine fits your line. Send them and we reply with a working proposal instead of a price list.
- Part and process: what you plate or paint, material, typical size.
- Output: parts per hour, shifts per day.
- Spec: coating thickness, colour standard, acceptance tests.
- Site: floor space, power supply, water and wastewater limits.
| What you send | What you get back |
|---|---|
| Part drawing or sample | Compatibility check and recommended settings |
| Output target per shift | Capacity, tank or rack count, manpower |
| Finish spec with tolerance | Control points and acceptance tests |
| Site conditions (power, water, space) | Layout proposal and utility requirements |
Buying questions we answer most
Can this machine be built for our voltage and local parts?
Yes. Voltage, plug type, rectifier rating, tank dimensions and rack design are built to order. Send the site conditions with the enquiry.
What installation support is included?
Layout drawing before shipment, remote commissioning support, and on-site installation on request. Operator training is part of the standard scope.
What are the spare parts and wear items?
Pumps, filter elements, contacts, seals and drive belts. A recommended first-year spare kit is quoted with the machine so production does not stop for a consumable.
What is the lead time and shipping method?
Typically 25-45 days after deposit for standard equipment, longer for custom lines. Sea freight in export packing; wooden case dimensions and weight are provided before booking.
Can we see it running before buying?
Yes. Factory video walk-through or an on-site visit, and if you send sample parts we run them on a comparable line and return them with a process report.
Put Barrel plating process into a process
- Process overview - how each stage connects
- Plating workshop - rack and barrel line layout
- Painting workshop - spray, cure and colour control
- Product overview - what else the line needs