Pre-Treatment — Technician Levels
Pick your level to see exactly which pages you should read. Each level below carries its own article library, with live article counts and the newest titles.
Search by trade + level (barrel senior), by defect (blistering), or by parameter (brightener dosing). Full-text and title search across the whole site.
Process route: Soak Clean → Electro-Clean → Acid Pickle → Rinse Cascade → Dry & Load
What each level covers
Article counts and the newest titles are read live from each section - they update automatically when new articles are published.
Pre-Treatment on the shop floor
Related: Process Overview · All trades · Process Selection
Pretreatment operator: daily control sheet
| Read | Frequency | Action if out |
|---|---|---|
| Degrease temperature | Start of shift + mid | Reheat, extend dwell |
| Degrease concentration | Daily titration | Replenish, check carry-over |
| Pickle strength | Daily | Top up acid, check iron build-up |
| Final rinse conductivity | Every 2 hours | Change water, check DI |
| Water-break test | Each rack | Re-degrease, do not plate |
FAQ
What do I do if the water-break test fails?
Do not plate. Return the rack to degrease - a failed break test guarantees an adhesion problem later.
How long can parts wait between stages?
Seconds. Keep them wet and move the rack; a dry surface passivates and will not plate evenly.