QLQ zinc alloy surface finishing equipment and process QLQ zinc alloy surface finishing equipment and process

Professional Zinc Alloy Surface Finishing Solutions

Pre-Treatment — Technician Levels

Pre-Treatment — Technician Levels

Pick your level to see exactly which pages you should read. Each level below carries its own article library, with live article counts and the newest titles.

Search by trade + level (barrel senior), by defect (blistering), or by parameter (brightener dosing). Full-text and title search across the whole site.

Pre-Treatment: which level are you?Four levels - the work you do on this equipment, and the pages you should read.Soak / electro / rinse / pickleJunior3+ years (qualified technician)Soak / electro / rinse / pickleIntermediate5+ years, solves 1-3 problem areas aloneSoak / electro / rinse / pickleSenior8+ years, covers most problems and trains othersSoak / electro / rinse / pickleManagement5+ years, full trade coverage and team leadership

Process route: Soak Clean → Electro-Clean → Acid Pickle → Rinse Cascade → Dry & Load

8-12 min
Cycle time
60% of load
Rinse water
< 2%
Rework

What each level covers

Article counts and the newest titles are read live from each section - they update automatically when new articles are published.

Soak / electro / rinse / pickle
Junior · 3+ years (qualified technician) 11 articles
Start here if you are 1-3 years in: the standard steps, the daily checks and the values you must not skip.
Inside: 5-step flow walk-through · daily check list · basic parameter values · simple do / do-not rules
Loading the latest articles…
Soak / electro / rinse / pickle
Intermediate · 5+ years, solves 1-3 problem areas alone 16 articles
For 3-5 years: diagnose defects, read real data (titration, hull cell, salt spray, film gauge) and set the working windows.
Inside: defect cause & cure · parameter windows · data reading · option comparisons
Loading the latest articles…
Soak / electro / rinse / pickle
Senior · 8+ years, covers most problems and trains others 10 articles
For 5-8 years: how the steps before and after this one change your result - root cause, cross-process reasoning, deep analysis.
Inside: root-cause tracing · interaction with pre-treatment / post-finish · failure analysis · boundary conditions
Loading the latest articles…
Soak / electro / rinse / pickle
Management · 5+ years, full trade coverage and team leadership 9 articles
For the supervisor / owner: cost per piece, capacity, staffing, emergency recovery and keeping customers happy.
Inside: cost & payback models · capacity and staffing · KPI and governance · claims & recovery plans
Loading the latest articles…

Pre-Treatment on the shop floor

Pre-Treatment LineINTERMEDIATEPre-Treatment - process boardOperatorLoad spacing decides everything - parts touching eachother never get clean.ChemistBelow 50 C the soak tank only moves the oil around, itdoes not remove it.QCWater-break test after the rinse: if the film holds,start the cycle again.ManagerOver-pickling costs more than under-pickling - 5-10% HClis enough.STEP 1Soak Clean55-65 C5-8 minpH 9-111STEP 2Electro-Clean3-6 A/dm21-3 minAnodic2STEP 3Acid Pickle5-10% HCl0.5-2 minRoom temp3STEP 4Rinse Cascade< 50 ppm2 stagesDI final4STEP 5Dry & Load70-80 C3-5 minNo water marks5!Drag-in from the soak tank kills the plating bath - rinse twice.COMMON MISTAKES vs WHAT WORKSfrom shop-floor auditsxSkip the water-break test to save timevTest every load - restart if the film holdsxTop up the soak tank with cold watervHold 55-65 C; under 50 C oils just movexOne rinse after picklingvTwo-stage cascade with a DI final rinse8-12 minCycle time60% of loadRinse water< 2%ReworkCASE FROM THE LINECase: a grey film on every part traced to a soak tank held at 41 C for a week.QLQ Surface Treatment | steps, roles, checkpoints, mistakes and a real case

Related: Process Overview · All trades · Process Selection

Pretreatment operator: daily control sheet

ReadFrequencyAction if out
Degrease temperatureStart of shift + midReheat, extend dwell
Degrease concentrationDaily titrationReplenish, check carry-over
Pickle strengthDailyTop up acid, check iron build-up
Final rinse conductivityEvery 2 hoursChange water, check DI
Water-break testEach rackRe-degrease, do not plate

FAQ

What do I do if the water-break test fails?

Do not plate. Return the rack to degrease - a failed break test guarantees an adhesion problem later.

How long can parts wait between stages?

Seconds. Keep them wet and move the rack; a dry surface passivates and will not plate evenly.

FAQ

What about pre-treatment — technician levels?
Pick your level to see exactly which pages you should read. Each level below carries its own article library, with live article counts and the newest titles.
What each level covers?
Article counts and the newest titles are read live from each section - they update automatically when new articles are published. Soak / electro / rinse / pickle Junior · 3+ years (qualified technician) 11 articles Start here if you are 1-3 years in: the standard steps, the daily checks and the values you must not skip
What about pre-treatment on the shop floor?
@keyframes f4{0%{transform:translateX(0);opacity:.2}10%{opacity:1}100%{transform:translateX(872px);opacity:.2}}@keyframes b4{0%,100%{opacity:.4}50%{opacity:1}}.f4{animation:f4 8s linear infinite}.b4{animation:b4 3s ease-in-out infinite}@media (prefers-reduced-motion: reduce){.f4,.b4{animation:none}} Pre-Treatment Line
What about pretreatment operator: daily control sheet?
Read Frequency Action if out Degrease temperature Start of shift + mid Reheat, extend dwell Degrease concentration Daily titration Replenish, check carry-over Pickle strength Daily Top up acid, check iron build-up Final rinse conductivity Every 2 hours Change water, check DI Water-break test Each rack Re-degrease, do n