A circular hole in a wet resin dome, a depression after curing, and a lifted edge require different investigations. This atlas helps technicians with three or more years of finishing experience separate appearance defects from adhesion failures on plated zinc-alloy bag hardware, decorative badges, and recessed metal emblems.

Scope: two-component epoxy doming. Silicone, PVC, polyurethane, and UV-curing materials require separate work instructions. Identify the chemistry before changing settings.

Evidence first: what these numbers mean

Supplier reference properties below are published values, not QLQ production results. The coupon matrix is an executable experiment with unmeasured fields clearly identified. No verified customer batch report, salt-spray result, or resin formulation was available in the searched QLQ knowledge-base notes; those results remain pending confirmation.

Local source: QLQ Obsidian Vault, equipment catalogue, page 25, stored under 03-equipment-technology/company-directory/machine-directory/page-25 as an English locator. That note lists QLQ-LSVM for liquid silicone vacuum processing and QLQ-12LSDM for silicone dispensing. Neither listing establishes epoxy compatibility. Confirm wetted materials, seals, metering, and cleaning requirements before equipment selection.

All proposed control bands in this article are trial work-instruction limits, not universal chemistry thresholds. A supervisor must approve them against the current resin technical data sheet, substrate specification, and customer acceptance criteria.

Defect atlas: inspect shape, timing, and interface

Observation-to-action map
DefectRecognitionFirst comparisonContainment and next action
FisheyeA wet film retreats around a centre; the substrate may remain exposed.Compare approved-clean and production-prepared coupons using one resin mix.Hold the affected tray. Investigate handling, polishing residue, release agents, cups, and wipes before changing resin.
CraterA shallow depression appears during levelling or cure; a bubble or particle may occupy its centre.Photograph immediately after dispensing and again before gel. Track whether a bubble collapses at that location.Inspect mixing, nozzle purging, dust protection, and substrate condition. A round depression alone does not prove contamination.
DelaminationEdges whiten, blister, or separate; a lifted fragment reveals an interface.Inspect both fracture faces under magnification: resin-to-topcoat, topcoat-to-plating, or plating-to-metal.Quarantine the lot and preserve failed pieces. A resin adjustment cannot repair plating that separates from zinc.

Record the first appearance time, tray position, cavity number, upstream finish, and mixing batch. A row-dependent pattern suggests something different from randomly scattered defects. Preserve one untouched failed part: wiping every sample destroys evidence.

WEST SYSTEM connects epoxy fisheyes with contaminated or inadequately prepared surfaces. Its troubleshooting advice also identifies contaminated mixing equipment and silicone-bearing cloths as possible sources. Use these as investigation leads, not proof that every crater is silicone-related. Source: WEST SYSTEM epoxy troubleshooting.

Working Data & Formula Notes

A complete shop-floor recipe can consist of two preformulated components. It need not reveal the supplier's proprietary raw ingredients. Feroca's rigid ClearWater doming system specifies 100 parts A to 30 parts B by weight. The table accounts for the entire unpigmented mix; it is not a QLQ proprietary formulation or approval for a particular plated finish. Source: Feroca rigid doming specifications.

Complete two-component make-up, parts by mass
ComponentRangeTypicalFunctionReplenishment
Matched component A, formulated epoxy base100 parts reference; fixed recipe basis100.0 g; 76.923% of final mixProvides the formulated resin phase and optical properties.Refill only the separate A reservoir with the approved grade and logged lot.
Matched component B, curing component30 parts nominal; proposed weighing-control band 29.7–30.3 per 100 A30.0 g; 23.077% of final mixReacts with A to form the cured network.Refill only the separate B reservoir. Check metering after refill; do not correct an ageing mixed cup.

The narrow weighing band is a proposed equipment-control tolerance, not supplier permission to vary stoichiometry. No solvent, water, pigment, defoamer, or adhesion additive belongs in this baseline recipe. Any approved additive creates a new controlled recipe and requires requalification.

Calculate hardener mass as mB = mA × 0.30. Thus 80.0 g A requires 24.0 g B, giving 104.0 g total. Record actual masses, not only the target. For a 0.1 g balance, avoid tiny batches whose hardener quantity approaches the instrument's practical uncertainty.

This is reactive batch preparation, not plating-bath replenishment. Never extend pot life by topping up old mixed resin. Label the cup when A and B first contact, and follow the approved waste procedure for expired material.

Reference properties and a controlled coupon experiment

Published material data: different systems, not interchangeable recipes
SystemA:B by massWorking lifeCure referenceHardnessTest condition
Feroca ClearWater rigid doming100:3015 minutes24 hours; allow 48–72 hours for full mechanical cureShore D 80, supplier valueWorking life at 20–22°C; room-temperature processing. Hardness test method not specified on the product page.
Epoxyset EB-107LP-1100:252 hours3 hours at 65°C; alternate 24–48 hours at 25°CShore D 85, supplier valuePot life: 100 g at 25°C. Hardness conditioning not specified on the product page.

Epoxyset also publishes mixed viscosity of 100–200 mPa·s and identifies small-component doming as an application. These figures demonstrate why a generic “epoxy setting” is unreliable. They do not predict adhesion or salt-spray performance on your hardware. Source: Epoxyset EB-107LP-1 data.

For the experiment, prepare three coupons per group from one plated lot and use one freshly mixed resin batch. Randomise tray positions. The challenged conditions stay in a segregated laboratory trial, never saleable production. Keep retained coupons for repeat testing.

Experimental comparison record: planned conditions; measured results pending
GroupControlled differenceFilm thicknessHardness / adhesionSalt-spray recordTest condition
A: referenceApproved cleaning and preparationTarget 0.60 ± 0.10 mm; measured value pendingCompanion hardness specimen and interface result pendingNot testedThree coupons; proposed 23 ± 2°C; identical cure and dispensing geometry
B: handling comparisonCurrent production handling instead of reference handlingSame target; measured value pendingResults pendingNot testedThree coupons; all other conditions match A; photograph wetting at fixed intervals
C: dispensing comparisonCurrent production nozzle instead of verified-clean trial nozzleSame target; measured value pendingResults pendingNot testedThree coupons; all other conditions match A; record nozzle identity and purge history

Measure thickness by an approved method suitable for the metal/resin stack, or use a sacrificial cross-section. A magnetic gauge may not isolate the resin layer on plated zinc. Report centre and edge locations separately rather than hiding dome geometry in one average.

Do not take a Shore D reading directly through a thin dome onto metal and compare it with a bulk-resin specification. Prepare a suitable companion specimen using the selected hardness method's geometry. Photograph the adhesion failure plane; use the customer's approved method for the actual coating thickness.

If salt spray is required, agree the method, exposure duration, edge sealing, scribing, and acceptance criteria beforehand. Record blistering, corrosion location, and delamination separately. “Not tested” must never become an invented pass or a promised service life.

Trend bands: distinguish normal variation from a hold trigger

The following provisional controls apply to the 100:30 reference trial. Validate them before production. A hold trigger means investigate and obtain disposition; it is not a scientifically established failure boundary. pH is not a useful direct control for this solvent-free epoxy mixture.

ParameterProposed normal bandDanger / hold thresholdTechnician response
B mass per 100 A29.7–30.3 g, target 30.0Outside the approved toleranceHold mix; verify tare, balance, and pump output.
Workstation temperature20–25°CBelow 18°C or above 30°CPause the trial and reassess cure or shortened working time.
Relative humidity40–60%, proposed trial bandAbove 70% or observed condensationCheck substrate dryness and environmental control.
Surface temperature above dew pointAt least 3°C marginBelow 3°C marginHold parts until dry and equilibrated; log both temperatures.
Mixed-material age0–10 minutes, conservative trial window10 minutes: internal hold; 15 minutes: published pot-life reference at 20–22°CDiscard according to approved instructions; never assume a warm cup has the reference life.
Dome centre thickness0.50–0.70 mm for the trial geometryOutside drawing toleranceHold tray and check dose, cavity area, and fixture level.
Dispensed shot massApproved target ±5%, provisionalMore than ±10%, or drawing limit exceededRecheck ten shots by mass; replace blocked or damaged dispensing hardware.

Plot readings against mixing time and tray sequence. A gradual change within the band can still matter: increasing shot mass with unchanged programming may precede overflow. Keep the numerical history so the next shift can identify drift.

Engineer Notes

  1. Number rejected parts before cleaning them. Photograph with a scale marker under identical lighting, and separate wet-film defects from post-cure failures.
  2. Check surface preparation on sacrificial coupons. WEST SYSTEM describes water sheeting as a useful contamination screen, but notes that water-soluble residues can escape detection. Dry completely afterwards. Source: WEST SYSTEM surface preparation.
  3. Approve any abrasion on plated hardware through the finish owner. Generic coarse-sanding advice must not be applied blindly to decorative plating or thin protective topcoats.
  4. Verify the two pumps separately by collecting and weighing their outputs. Combined shot weight alone cannot show that the A:B ratio is correct.
  5. Put the mixing timer beside the dispenser. Count mixing, transfer, any approved degassing, and application within the working window; do not restart the timer after transfer.
  6. Keep a retained resin specimen for each investigated batch. Label material lots, actual ratio, cure history, and inspection date so hardness changes remain traceable.
  7. Use SDS-specified gloves, eye protection, ventilation, and spill controls. Do not use an open flame near finishing solvents. Restrict heating and vacuum treatment to qualified instructions.

Two diagnostic cases to practise

These are training scenarios, not documented customer successes or measured outcomes.

Case 1: fisheyes on recessed bag emblems

Defects cluster on one tray after a handling change. Compare reference-prepared coupons with coupons following the actual production route. Keep resin, thickness, and cure unchanged. If only the production-route group fails, trace that route one step at a time. If both fail, investigate shared material and equipment. The junior technician's deliverable is a labelled comparison, not a guess about silicone.

Case 2: edge lifting on plated zipper pull decorations

Parts appear sound at first inspection but lift during an approved conditioning test. Preserve fragments and identify the separation plane. Compare retained parts from the same plating lot, including undecorated parts where available. If plating is attached to the resin fragment, involve the upstream plating team. If separation occurs above a clear topcoat, evaluate that interface through the finish owner. Close the investigation only after the selected correction survives repeat qualification.

Shift Checks

Shift stageCheck itemFrequencyAcceptance standardRecord
Before shiftMaterial identity and balanceStart; every material changeMatched approved A/B lots; balance passes its documented checkLot codes, expiry, check weight, operator
Before shiftEnvironment and first-piece approvalStart; after interruptionApproved bands; dry substrate; conforming reference pieceTemperature, humidity, dew-point margin, photograph
During shiftRatio and mixed ageEvery mix; pump check after refillApproved ratio; application finishes inside validated working windowActual masses, mix start, last dispensing time
During shiftShot mass and defectsTen shots at setup; hourly and after nozzle changeApproved dose; no customer-prohibited defectsIndividual weights, inspected quantity, rejects by type
After shiftCure identification and retained samplesEvery retained batchTrays traceable; full required cure completed before releaseTray IDs, cure start/end, retained specimen location
After shiftCleaning and handoverShift endApproved cleaning completed; held lots clearly segregatedCleaning sign-off, waste record, open issues and owner

FAQ: technician questions to AI

“AI, my resin has round holes. Should I add more hardener?”

No. Preserve the specified ratio. First establish whether the film retreats while wet or a bubble collapses later. Compare controlled coupons and check preparation and dispensing. More hardener is not a validated crater remedy.

“AI, the dome feels hard, so why does it peel off the plating?”

Hardness and adhesion measure different things. Identify the failure plane and inspect the finish beneath it. A hard resin can separate from an incompatible topcoat, while poorly attached plating can detach beneath otherwise sound resin.

“AI, can I report a salt-spray pass before the lab finishes?”

No. Report the test as pending, including the agreed method and specimen IDs. Published resin hardness does not establish corrosion resistance for the complete plated-and-domed component. Release requires authorised evidence.

What Would You Like to Solve?

Send defect photographs, substrate and plating stack, resin identity, actual A:B weights, cure history, and the acceptance test you need to meet to [email protected]. These records support a focused engineering review. For upstream process coordination, see surface-treatment line equipment, chemistry, and support.

Resin Drip Defect Atlas: Fisheyes, Craters, Delamination Data Schematic cross-sections show resin withdrawing from a contaminated spot, a crater depression, and a coating lifting from a weak interface. These are possible mechanisms, not diagnoses from appearance alone. A twelve-second loop highlights wetting, defect formation and inspection. Reduced motion displays the final defects without animation. Resin drip defects: surface vs. interface Cross-section atlas • possible mechanisms • schematic, not to scale 01 / Fisheye Local contamination disrupts wetting Resin draws away Oil / silicone residue Check cleanliness before changing resin. 02 / Crater A local depression in the resin surface Depressed centre Inspect depth and residue Shape alone does not prove the cause. 03 / Delamination Adhesion fails at a weak interface Interfacial separation Check pretreatment and adhesion. INSPECTION DATA: defect type + location + count / inspected area + batch + surface preparation 1 / Initial contact 2 / Defect develops 3 / Inspect and record • 12 s loop